PROJECT / SOURCE-BACKED RECORD

The North Star Project

The North Star Project is a bioenergy with carbon capture and storage project in Saskatchewan developed in partnership with the Meadow Lake Tribal Council. The project will capture approximately 145,000 tonnes of biogenic CO₂ annually and generate carbon removal credits.

Province or territory: Saskatchewan · Source-described stage: FEED · Source location: Saskatchewan — regional placement

SOURCE FACT

What the public record says

The North Star Project is a bioenergy with carbon capture and storage project in Saskatchewan developed in partnership with the Meadow Lake Tribal Council. The project will capture approximately 145,000 tonnes of biogenic CO₂ annually and generate carbon removal credits. Source-described stage: FEED. Location: Saskatchewan — regional placement.

WHY IT MATTERS

How BuildAtlas reads this record

This record is retained because it helps connect a named project to the capabilities, dependencies, and constraints around delivery.

SYSTEM CONTEXT

What to keep in view

    LIMIT

    What this page does not establish

    A source-described stage, capital figure, or proposed capability is not the same as completed construction, committed financing, operating output, or guaranteed delivery. BuildAtlas keeps those distinctions visible.

    EVIDENCE

    Read the source record

    Primary project evidence is retained with the record and remains attributable to the source. Canada Investment Summit Prospectus · source material observed by BuildAtlas 2026-09-14.

    BuildAtlas separates public-source facts, reported statements, and its own clearly labelled interpretation. See the methodology for how to read the evidence.