PROJECT / SOURCE-BACKED RECORD

Selkirk Float Glass Project

The Selkirk Project is a proposed 600 tonnes per day production capacity float glass manufacturing facility in Manitoba designed to supply approximately 60% of Canada’s float glass demand. The project is backed by 24.4 million tonnes of company-owned low-iron silica sand resources, secured permitting, site control and a First Nations participation agreement.

Province or territory: Manitoba · Source-described stage: Pre-Construction · Source location: Manitoba — regional placement

SOURCE FACT

What the public record says

The Selkirk Project is a proposed 600 tonnes per day production capacity float glass manufacturing facility in Manitoba designed to supply approximately 60% of Canada’s float glass demand. The project is backed by 24.4 million tonnes of company-owned low-iron silica sand resources, secured permitting, site control and a First Nations participation agreement. Source-described stage: Pre-Construction. Location: Manitoba — regional placement.

WHY IT MATTERS

How BuildAtlas reads this record

This record is retained because it helps connect a named project to the capabilities, dependencies, and constraints around delivery.

SYSTEM CONTEXT

What to keep in view

    LIMIT

    What this page does not establish

    A source-described stage, capital figure, or proposed capability is not the same as completed construction, committed financing, operating output, or guaranteed delivery. BuildAtlas keeps those distinctions visible.

    EVIDENCE

    Read the source record

    Primary project evidence is retained with the record and remains attributable to the source. Canada Investment Summit Prospectus · source material observed by BuildAtlas 2026-09-14.

    BuildAtlas separates public-source facts, reported statements, and its own clearly labelled interpretation. See the methodology for how to read the evidence.