Scully Manganese Sulphate Plant
The Scully Manganese Sulphate Plant will convert manganese ore generated as a by-product of iron ore production at Tacora’s Scully Mine into high-purity manganese sulphate monohydrate (HPMSM) for the EV and battery sector. Supported by more than 3.5 million tonnes of stockpiled manganese ore, the project leverages existing mining operations and completed economic studies to establish a domestic battery materials supply opportunity.
Province or territory: UNKNOWN · Source-described stage: Preliminary Economic Assessment (PEA) completed · Source location: Canada — location not yet normalized
What the public record says
The Scully Manganese Sulphate Plant will convert manganese ore generated as a by-product of iron ore production at Tacora’s Scully Mine into high-purity manganese sulphate monohydrate (HPMSM) for the EV and battery sector. Supported by more than 3.5 million tonnes of stockpiled manganese ore, the project leverages existing mining operations and completed economic studies to establish a domestic battery materials supply opportunity. Source-described stage: Preliminary Economic Assessment (PEA) completed. Location: Canada — location not yet normalized.
How BuildAtlas reads this record
This record is retained because it helps connect a named project to the capabilities, dependencies, and constraints around delivery.
What to keep in view
What this page does not establish
A source-described stage, capital figure, or proposed capability is not the same as completed construction, committed financing, operating output, or guaranteed delivery. BuildAtlas keeps those distinctions visible.
Read the source record
Primary project evidence is retained with the record and remains attributable to the source. Canada Investment Summit Prospectus · source material observed by BuildAtlas 2026-09-14.
BuildAtlas separates public-source facts, reported statements, and its own clearly labelled interpretation. See the methodology for how to read the evidence.