Redcliff AI Data Center Campus
BW Velora is advancing the Redcliff AI Data Center Campus, a 480-acre greenfield AI compute hub near Medicine Hat, Alberta. Phase 1 includes 884 MW of behind-the-meter generation supporting 760 MW of firm power and a 650 MW IT load, with total site capacity exceeding 1.2 GW. The project seeks investment for its $14.5 billion build-out and large-scale AI infrastructure deployment.
Province or territory: Alberta · Source-described stage: FEED and permitting ongoing · Source location: Near Medicine Hat, Alberta — regional placement
What the public record says
BW Velora is advancing the Redcliff AI Data Center Campus, a 480-acre greenfield AI compute hub near Medicine Hat, Alberta. Phase 1 includes 884 MW of behind-the-meter generation supporting 760 MW of firm power and a 650 MW IT load, with total site capacity exceeding 1.2 GW. The project seeks investment for its $14.5 billion build-out and large-scale AI infrastructure deployment. Source-described stage: FEED and permitting ongoing. Location: Near Medicine Hat, Alberta — regional placement.
How BuildAtlas reads this record
Redcliff makes the Alberta compute thesis concrete: very large digital load is being proposed alongside dedicated power infrastructure. The scale and timing remain proponent-reported and subject to permitting and financing.
What to keep in view
- Requires: ai compute, data centre operations, power generation, engineering construction.
- Dependencies: natural gas supply, industrial land, fibre connectivity.
- Open constraints: grid connection capacity, permitting and community readiness, water and cooling.
What this page does not establish
A source-described stage, capital figure, or proposed capability is not the same as completed construction, committed financing, operating output, or guaranteed delivery. BuildAtlas keeps those distinctions visible.
Read the source record
Primary project evidence is retained with the record and remains attributable to the source. Canada Investment Summit Prospectus · source material observed by BuildAtlas 2026-09-14.
BuildAtlas separates public-source facts, reported statements, and its own clearly labelled interpretation. See the methodology for how to read the evidence.