Project Titan - Sulphate of Potash Production
Project Titan is SMMI’s next-phase sulphate of potash (SOP) expansion in Saskatchewan, leveraging the company’s unique access to both sodium sulphate and potash resources. The project will develop a 50,000-100,000 tonne per year SOP facility at Chaplin, using the lower-energy Glaserite production process.
Province or territory: Saskatchewan · Source-described stage: Phase 2 (Chaplin) is shovel-ready and in the financing stage; Phase 3 (Fox Valley) is in pre-development · Source location: Saskatchewan — regional placement
What the public record says
Project Titan is SMMI’s next-phase sulphate of potash (SOP) expansion in Saskatchewan, leveraging the company’s unique access to both sodium sulphate and potash resources. The project will develop a 50,000-100,000 tonne per year SOP facility at Chaplin, using the lower-energy Glaserite production process. Source-described stage: Phase 2 (Chaplin) is shovel-ready and in the financing stage; Phase 3 (Fox Valley) is in pre-development. Location: Saskatchewan — regional placement.
How BuildAtlas reads this record
This record is retained because it helps connect a named project to the capabilities, dependencies, and constraints around delivery.
What to keep in view
What this page does not establish
A source-described stage, capital figure, or proposed capability is not the same as completed construction, committed financing, operating output, or guaranteed delivery. BuildAtlas keeps those distinctions visible.
Read the source record
Primary project evidence is retained with the record and remains attributable to the source. Canada Investment Summit Prospectus · source material observed by BuildAtlas 2026-09-14.
BuildAtlas separates public-source facts, reported statements, and its own clearly labelled interpretation. See the methodology for how to read the evidence.