PROJECT / SOURCE-BACKED RECORD

Prairie Lithium Project

The Prairie Lithium Project is a large-scale lithium brine development in southeast Saskatchewan utilizing direct lithium extraction (DLE) technology. The 100%-owned project hosts a 4.6 million tonne LCE resource and is advancing toward commercial production, supported by strong infrastructure access and binding offtake agreements. Construction of the first commercial facility is underway, with future phases planned to expand production and add battery-grade lithium conversion capacity.

Province or territory: Saskatchewan · Source-described stage: Construction of Phase 1 production facility underway · Source location: Saskatchewan — regional placement

SOURCE FACT

What the public record says

The Prairie Lithium Project is a large-scale lithium brine development in southeast Saskatchewan utilizing direct lithium extraction (DLE) technology. The 100%-owned project hosts a 4.6 million tonne LCE resource and is advancing toward commercial production, supported by strong infrastructure access and binding offtake agreements. Construction of the first commercial facility is underway, with future phases planned to expand production and add battery-grade lithium conversion capacity. Source-described stage: Construction of Phase 1 production facility underway. Location: Saskatchewan — regional placement.

WHY IT MATTERS

How BuildAtlas reads this record

This record is retained because it helps connect a named project to the capabilities, dependencies, and constraints around delivery.

SYSTEM CONTEXT

What to keep in view

    LIMIT

    What this page does not establish

    A source-described stage, capital figure, or proposed capability is not the same as completed construction, committed financing, operating output, or guaranteed delivery. BuildAtlas keeps those distinctions visible.

    EVIDENCE

    Read the source record

    Primary project evidence is retained with the record and remains attributable to the source. Canada Investment Summit Prospectus · source material observed by BuildAtlas 2026-09-14.

    BuildAtlas separates public-source facts, reported statements, and its own clearly labelled interpretation. See the methodology for how to read the evidence.