Minto Copper/Gold/Silver Project
The Minto Project is a brownfield copper-gold-silver mine in Yukon that produced venmore than 500 million pounds of copper before ceasing operations in 2023. Acquired by the Selkirk First Nation and now being advanced by Selkirk Copper, the project combines existing mining infrastructure with a substantial resource base and recent exploration success, supporting a planned restart and expansion based on responsible mining and Indigenous partnership.
Province or territory: Yukon · Source-described stage: Restart evaluation · Source location: Yukon — regional placement
What the public record says
The Minto Project is a brownfield copper-gold-silver mine in Yukon that produced venmore than 500 million pounds of copper before ceasing operations in 2023. Acquired by the Selkirk First Nation and now being advanced by Selkirk Copper, the project combines existing mining infrastructure with a substantial resource base and recent exploration success, supporting a planned restart and expansion based on responsible mining and Indigenous partnership. Source-described stage: Restart evaluation. Location: Yukon — regional placement.
How BuildAtlas reads this record
This record is retained because it helps connect a named project to the capabilities, dependencies, and constraints around delivery.
What to keep in view
What this page does not establish
A source-described stage, capital figure, or proposed capability is not the same as completed construction, committed financing, operating output, or guaranteed delivery. BuildAtlas keeps those distinctions visible.
Read the source record
Primary project evidence is retained with the record and remains attributable to the source. Canada Investment Summit Prospectus · source material observed by BuildAtlas 2026-09-14.
BuildAtlas separates public-source facts, reported statements, and its own clearly labelled interpretation. See the methodology for how to read the evidence.