Mactaquac Life Achievement Project (MLAP)
Mactaquac Generating Station Life Extension Project is a major brownfield hydroelectric infrastructure initiative to extend the operational life of New Brunswick’s 668 MW Mactaquac Generating Station to its intended 100-year lifespan. The project includes structural rehabilitation, equipment replacement and enhanced fish passage infrastructure.
Province or territory: New Brunswick · Source-described stage: Currently in the engineering and design phase · Source location: New Brunswick — regional placement
What the public record says
Mactaquac Generating Station Life Extension Project is a major brownfield hydroelectric infrastructure initiative to extend the operational life of New Brunswick’s 668 MW Mactaquac Generating Station to its intended 100-year lifespan. The project includes structural rehabilitation, equipment replacement and enhanced fish passage infrastructure. Source-described stage: Currently in the engineering and design phase. Location: New Brunswick — regional placement.
How BuildAtlas reads this record
This record is retained because it helps connect a named project to the capabilities, dependencies, and constraints around delivery.
What to keep in view
What this page does not establish
A source-described stage, capital figure, or proposed capability is not the same as completed construction, committed financing, operating output, or guaranteed delivery. BuildAtlas keeps those distinctions visible.
Read the source record
Primary project evidence is retained with the record and remains attributable to the source. Canada Investment Summit Prospectus · source material observed by BuildAtlas 2026-09-14.
BuildAtlas separates public-source facts, reported statements, and its own clearly labelled interpretation. See the methodology for how to read the evidence.